Cost guides · Updated 3 August 2026
Home Rewiring Cost in Melbourne (2026 Guide)
Rewiring is priced by the number of points and how hard the cable is to get to them. Here is what full and partial rewires cost by house size and era, and what the plaster repair really adds.
- 9 min read
- Written for Victoria
- 2026 figures
The short answer
Rewiring a house in Melbourne costs roughly $8,000 to $12,000 for a small home of up to about 90 square metres, $11,000 to $18,000 for a three bedroom single storey house, and $18,000 to $30,000 or more for a large or double storey home. A partial rewire covering a few circuits or one area runs about $2,500 to $6,000. A switchboard upgrade is generally included or added at $800 to $3,500. Plastering and painting are usually separate.
- Partial rewire
- $2,500 - $6,000
- Small home full rewire
- $8,000 - $12,000
- Three bedroom full rewire
- $11,000 - $18,000
- Switchboard component
- $800 - $3,500+
What a rewire involves and what triggers one
A rewire replaces the cabling between the switchboard and every point in the house: power points, light points, hardwired appliances, smoke alarms and any dedicated circuits. It is a replacement of the whole distribution system, priced by the number of points and how difficult the cable is to physically get to each of them.
The triggers are fairly consistent. Rubber or fabric insulated cable, common in Melbourne homes wired before about 1960, becomes brittle and crumbles when disturbed, which means every time someone works on the house they create a new fault. If an electrician has told you the wiring crumbles when handled, that is the finding that ends the conversation about patching.
The other triggers are less dramatic but just as common. A house extended three times with circuits nobody can trace. Undersized cabling that cannot carry a modern kitchen. Persistent tripping that survives fault finding. Rodent or water damage across a roof space. Or a renovation extensive enough that the walls are open anyway, which is by a wide margin the cheapest moment to rewire.
Not everything alarming needs a rewire. Old but sound TPS cable from the 1970s or 1980s is frequently fine and simply needs a modern board with RCD protection. An honest home rewiring assessment tells you which situation you are in, and it involves testing rather than a glance at the meter box.
Full or partial rewire
A full rewire replaces everything. It is the right answer when the cable type itself is the problem, because rubber insulated wiring does not become safe by leaving half of it in place. It is also the right answer during a substantial renovation, when the incremental cost of doing the lot is far lower than doing it later.
A partial rewire replaces specific circuits or a specific area. It suits a house where the original wiring is sound but one section has been damaged, where a 1990s extension is fine and the 1940s original is not, or where a kitchen or bathroom is being renovated and those circuits need bringing up to standard. Indicatively $2,500 to $6,000 depending on how many circuits and how accessible they are.
The trap with partial rewiring is that it can cost more per point than doing the whole house, because the set up, the board work, the access and the making good are largely the same whether you replace six circuits or sixteen. If half the house needs replacing, ask what the full rewire number is, because the gap is often smaller than people expect. The other consideration is disruption. A full rewire is one period of mess. Two partial rewires five years apart is two lots of plaster repair and two lots of painting.
Full rewire
Everything replaced. Necessary where the cable type itself has failed, and the sensible option during a major renovation.
Partial rewire
Indicatively $2,500 to $6,000. Suits sound houses with one damaged or outdated section, or a single room renovation.
Board only
Where the cable is sound but the protection is not, a switchboard upgrade at $800 to $3,500 or more may be all that is needed.
During renovation
Open walls and lifted floors remove most of the access cost and nearly all of the making good. By far the cheapest time to do it.
What it costs by house size and era
These are indicative ranges for occupied Melbourne homes, replaced by a written quote after an inspection and testing. Rewiring is the job where an estimate given without a site visit is worth the least, because two identical looking weatherboards can differ by $6,000 on access alone.
| Scope | Typical property | Indicative cost |
|---|---|---|
| Partial rewire | Selected circuits or one area of the house | $2,500 - $6,000 |
| Full rewire, small home | Up to about 90 sqm, one or two bedrooms | $8,000 - $12,000 |
| Full rewire, standard home | 120 - 160 sqm, three bedroom single storey | $11,000 - $18,000 |
| Full rewire, large or double storey | 200 sqm plus, or two levels | $18,000 - $30,000+ |
| Switchboard component | Included in most full rewires, otherwise separate | $800 - $3,500+ |
| Plaster patching and making good | Where a plasterer is engaged separately | $1,000 - $3,000 |
Indicative ranges for planning only. Occupied homes cost more than empty ones, single storey less than double, and a house with a walkable roof space and an accessible subfloor considerably less than one on a slab. Painting is almost always excluded and quoted separately.
Plaster damage and making good
This is the part people are not prepared for. Cable has to physically travel from the switchboard to every point in the house, and in an occupied home with closed walls it cannot always do that through a roof space or under a floor.
The good case is a single storey house with a walkable roof space and an accessible subfloor. Cable drops down inside wall cavities from above or comes up from below, and the only damage is at the point itself. The difficult case is a slab floor, a double storey where the ground floor ceiling is closed, or a house with plaster or render directly on brick, where reaching a switch on an internal wall means chasing the wall out.
A good electrician minimises it by planning cable routes through existing cavities, reusing existing switch and outlet positions, and cutting neat access holes rather than random ones. What nobody can do is deliver zero damage in a closed up brick house.
On who fixes it, be specific when you compare quotes. Some electricians patch holes back to a paintable finish. Some leave neat square holes for a plasterer. Some exclude making good entirely. All three are legitimate and they are very different amounts of work. A plasterer engaged separately for a whole house is an indicative $1,000 to $3,000, and painting is separate again. Two quotes $2,000 apart can be identical once making good is on the same basis.
Staging the work and the switchboard component
A full rewire on an occupied house is usually done in stages so that the household is never without power overnight. A typical sequence works room by room or circuit by circuit, with the new cabling run and terminated progressively and the changeover at the board managed so that what is live stays live.
For a standard three bedroom house, expect roughly one to two weeks on site, longer for a large or double storey home. Power is off for parts of each day rather than continuously. If there is something in the house that cannot lose supply, such as a medical device or a home office with fixed hours, say so before the job is priced rather than on the first morning.
The switchboard is part of the job rather than an optional extra. A rewire terminates at a board, and putting new cabling into an old fuse board defeats most of the purpose. On most full rewires the board is included in the price, and it is worth confirming that in writing because a quote that excludes it looks cheaper than one that does not. Where it is separate, it is $800 to $3,500 or more depending on circuit count, phase and whether the board needs relocating. Our switchboard cost guide covers the three tiers in detail.
This is also the moment to plan forward. A rewire is the one time the whole house is open, so adding extra power points where you have been running extension leads, sorting out the lighting layout, or providing for a future EV charger or heat pump costs a fraction of what it costs as a separate visit later.
What makes a quote go up or down
Rewiring quotes vary more than any other residential electrical job. These are the reasons, and an electrician who has actually walked the house will have priced all of them.
Number of points
The base of the price. Every power point, light point, switch and hardwired appliance is a termination and a cable run. Adding points during a rewire is cheap. Adding them afterwards is not.
Access above and below
A walkable roof space and a crawlable subfloor is the cheap case. A slab floor, a low pitch roof or a closed intermediate ceiling on a double storey pushes cable into walls and the price upward.
Wall construction
Timber frame with plasterboard is straightforward. Solid double brick, plaster on brick, or lath and plaster in a period home all mean chasing, more mess and more making good.
Occupied or empty
An empty house is faster and cheaper. Furniture, floor coverings, working from home and a household that needs power each evening all add time.
How much making good is included
The most common reason two quotes differ without appearing to. Establish whether patching, plastering and painting are in or out before comparing anything.
Switchboard scope
Whether the board is included, and whether it is a straight replacement or a relocation to a compliant external position, moves the total by $800 to $3,500 or more.
Surprises in the walls
Asbestos backing, previous unlicensed work, hidden junctions and cable buried in render are found during the job. A good quote says what happens to the price if they turn up.
How to compare rewiring quotes fairly
Because rewiring quotes are large and the scope is invisible, they are the easiest quotes in the trade to compare wrongly. The cheapest number is very often the one with the least in it.
Ask every electrician to write down the same six items. The number of points, listed by room. Whether the switchboard is in the price and what tier of board it is. What making good is included: patching only, patching to a paintable finish, or nothing. Whether smoke alarms and dedicated circuits are included. The expected duration and how power is managed each day. And what happens to the price if something unexpected is found in the walls.
Then confirm the compliance side. Electrical work in Victoria must be carried out by a licensed electrician, and a Registered Electrical Contractor must issue a Certificate of Electrical Safety for prescribed work. On a rewire that certificate is a document you will want at sale time and for insurance, and it should never be an optional line. The electrician cost guide explains how the hourly and fixed price structures behind these numbers work.
Pivot Trade Services holds REC 37223, rewires homes across Melbourne west including Footscray and the older parts of Altona, and carries a 12 month workmanship guarantee. If a rewire is not what your house needs, we will tell you that too. To get the wiring tested and a scope written down, get in touch.
Figures in this guide are indicative and were accurate at the time of writing (3 August 2026). Rebate values, eligibility rules and certificate-linked discounts change regularly. Confirm current amounts with the program administrator, and treat your written quote as the accurate figure for your property.
Answers
Frequently asked questions
Indicatively $8,000 to $12,000 for a small home up to about 90 square metres, $11,000 to $18,000 for a three bedroom single storey house, and $18,000 to $30,000 or more for a large or double storey property. A partial rewire covering selected circuits runs $2,500 to $6,000. Access, wall construction and how much making good is included move all of those significantly.
The clearest sign is the cable type. Rubber, fabric or cloth covered wiring, common before about 1960, becomes brittle and crumbles when disturbed, and cannot be safely patched. Other signs are circuits nobody can trace, persistent tripping that survives fault finding, undersized cable feeding a modern kitchen, or rodent and water damage. Testing tells you, not the age of the house alone.
Usually yes. The work is staged so that power is off for parts of each day rather than continuously, and we do not leave a house without supply overnight. Expect roughly one to two weeks on site for a standard three bedroom home. If something in the house genuinely cannot lose power, tell the electrician before the job is priced.
It depends entirely on access. A single storey house with a walkable roof space and an accessible subfloor may only have damage at each point. A slab floor or plaster directly on brick means chasing walls, and the damage is significant. Ask each quote what making good is included, because patching, plastering to a paintable finish and doing nothing are three different prices.
On most full rewires yes, because new cabling terminating into an old fuse board defeats the purpose of the exercise. Confirm it in writing, since a quote that excludes it looks cheaper than one that includes it. Where the board is priced separately it is $800 to $3,500 or more depending on circuit count, phase and whether it needs relocating.
Yes, and it is the best value decision available during a rewire. The cable routes are already open, the electrician is already on site and the making good is already happening. Additional power points, better lighting positions and provision for a future EV charger or heat pump cost a fraction of what the same work costs as a separate job later.
It can, and sometimes budget makes that the only option. Be aware it costs more in total, because the set up, the board work, the access and the making good largely repeat each time. It also means two or three rounds of mess, plastering and painting instead of one. If the whole house needs it, doing it once is cheaper.
Yes. Electrical work in Victoria must be carried out by a licensed electrician, and a Registered Electrical Contractor must issue a Certificate of Electrical Safety for prescribed work. On a rewire that certificate matters at sale time and for insurance. Pivot Trade Services holds REC 37223 and issues the certificate on completion of every job.
Browse every cost, rebate and comparison guide in the Pivot guides library, or claim the $60 off your first job voucher.
Want this priced for your place?
Tell us what you need and we will give you a written price, not a range that moves on the day.
- Free
- On-site quotes
- Fixed
- Written pricing
- 12 mth
- Workmanship guarantee
- 5.0★
- 63 Google reviews