Renovation and redevelopment work, done in the right order

Electrician in Braybrook

Braybrook is a renovation and redevelopment suburb. Original post-war homes, public housing stock, and a heavy wave of townhouse development turning single blocks into multi-unit sites. On most streets something is being built, extended or gutted.

  • Braybrook 3019
  • Jemena network
  • REC 37223

The short answer

Pivot Trade Services is a licensed electrician working in Braybrook 3019 under REC 37223, thirteen kilometres from our Altona base. We cover switchboards, safety switch retrofits, staged rewires, temporary builder supplies, multi-unit meter panels, solar and EV chargers. Braybrook is on the Jemena network, and its established homes are among the most likely in Melbourne’s west to still have no RCD protection anywhere in the installation.

Switchboard fitted with three surge arrestors alongside the main breakers

From one of our jobs

Whole-of-home surge protection at the board

Photographed on site in Melbournes west. REC 37223.

That means the work here is staged, and the order matters more than in a suburb where you turn up and do one job. Get the supply and the board right first, and everything else has somewhere compliant to connect. Do it the other way around and you pay twice.

Supply and board first, everything else second

On a renovation, the temptation is to start with the visible work. New kitchen, new lighting, new heating. But every one of those needs a circuit, and every circuit needs protection and space at the board. If the board is original and full, the work either cannot be certified or it gets squeezed in badly and has to be redone.

So we sequence it. Temporary builder supply if the house is being opened up, then the board and any consumer mains work, then the rough-in for the new circuits, then fit-off. A board replacement runs $800 to $3,500 depending on circuit count and meter panel condition, and doing it at the start of a renovation is materially cheaper than retrofitting around finished plaster.

  • Temporary supply

    A compliant builder supply keeps the site working safely while the permanent installation is out.

  • Rough-in before lining

    Cable run while walls are open costs a fraction of the same run after the plaster goes on.

  • Plan the spare ways

    A charger, a split system and a solar inverter all need a way at the board. Allow for them now.

Houses with no safety switches at all

Braybrook has one of the highest rates we see of established homes with no RCD protection anywhere. Not one RCD covering the house, none at all. Breakers or fuses protecting the cable, and nothing protecting the person.

That is the single most valuable thing to fix in one of these houses, and it is not expensive relative to what it does. Adding RCD protection to a sound board is $120 to $300 per device. Where the board cannot take it, a replacement with RCBOs on every circuit is the answer, and it also gives you fault containment so one faulty appliance does not black out the whole house.

Multi-unit sites: supplies, meters and individual boards

Turning one block into three townhouses creates three separate electrical installations. Each needs its own supply, its own metering position and its own switchboard, with sub-mains sized for the load and for the distance from the point of supply, which is not the same for the front unit and the rear one.

The metering arrangement has to be agreed with the distributor and the metering provider and built in correctly the first time, because relocating a meter panel after the render is on is an expensive lesson. We handle those applications alongside the physical work rather than leaving the builder to chase them at fit-off.

  • One board per dwelling

    Individual boards with RCBOs and accurate labelling, plus spare ways for the first owner who buys an EV.

  • Sub-main sizing

    Calculated for each dwelling and its run, because the rear unit is a longer and heavier cable than the front.

  • Application timing

    Distributor and metering applications start early. They are usually the longest item on the timeline.

Staged rewiring in an occupied house

Not every Braybrook renovation empties the house. Where people are living through it, a full rewire in one hit is impractical, so we stage it: circuit by circuit, room by room, keeping the kitchen and one living area energised while the rest is worked on.

It takes longer overall and it is far easier to live with. The important part is that the staging is planned rather than improvised, so the installation is never left in a half-connected state overnight, and each completed stage is tested and certified as it is finished rather than everything being signed off at the end.

Solar on a block that may be redeveloped

One question worth asking in Braybrook before spending on solar is how long the house is staying. If a block is likely to be redeveloped inside a few years, a full system on the existing roof is money that will not be recovered, and we would rather say so than take the order.

Where the house is staying, the older single-storey roofs here are decent solar territory: reasonable area, limited shading and simple planes. A 6.6kW system is $4,500 to $8,500 before STCs and roughly $3,000 to $6,000 after. On new townhouses the roof area per dwelling is small, so realistic sizing and a focus on daytime self-consumption matter more than headline capacity.

On the ground

What we see in Braybrook homes

  • Established houses with no RCD protection anywhere in the installation, which is now uncommon even in the older west.
  • Renovations where the new kitchen and lighting were installed before anyone looked at whether the board could carry them.
  • Multi-unit sites where the meter panel position was set by the builder without reference to the metering provider.
  • Occupied houses being rewired in stages, which needs planned staging rather than improvisation to stay safe overnight.
  • Older blocks with solar quotes that make no sense given how likely the site is to be redeveloped.
REC 37223SAA S3962281ABN 876892969375.0 from 63 Google reviews12 month workmanship guarantee

Licensed and accredited work by a local team. Read about Pivot Trade Services or see recent jobs across the western suburbs.

Answers

Braybrook questions

Before the walls are lined, and ideally before the design is locked. Cable run while walls are open costs a fraction of the same run afterwards, and the board work that everything else depends on is far cheaper at the start. We also need to know what is coming, because a charger, a ducted system and an induction cooktop each need a way at the board and they are easy to allow for early.

Get a Braybrook quote

Tell us the address and what you need. We quote Braybrook 3019 and the surrounding western suburbs in writing, with no obligation.

Free